From our factory to your site: the structure stands in two days — turnkey in three months.
- 1Foundation
- 2Modules set · 2 days
- 3Insulation
- 4Waterproofing
- 5Turnkey
From our factory to your site: the structure stands in two days — turnkey in three months.
All the electricity for a ~100 m² home and a family of four — solar, ventilation, everything included.
~100 m² home · family of four · energy in a year
gas + electricityfrom its own rooffrom the grid
Active house: its roof makes more energy than the home uses in a year.
≈ ¼ of the energy · ≈ 1/13 bought from the grid · bill ≈ 1/7
KV Homes Horizon, 107 m², 4 people — engineering simulation. €320 is the median yearly bill at our four price sets (HU €147 · US €289 · FR €356 · AT €550), against ≈ €2,360 for an average gas-heated home.
Floor, walls and the whole roof in reinforced concrete — made to last a century.
Timber frame / SIPwood can rot once moisture gets in
Brick, timber roofroof renewal around 50 years
KV reinforced concretewalls, floors and the roof
Not a timber house. Not brick under a timber roof. Even the roof is reinforced concrete.
Illustrative — service life depends on design, moisture and upkeep. KV: 100+ years structural design life.
Priced like a conventionally built house — not like a high-end one.
Price per m² — KV Homes = 100%
High-end specification — at the price of a conventionally built house.
Floor, walls and ceiling: one reinforced-concrete casting from our own steel molds. On site, a crane sets each piece in place.
VB = vasbeton, Hungarian for reinforced concrete. Geometry: KV Homes element types (IFC) — a 6.30 × 3.49 × 1.70 m H element with a 38° roof; then a two-storey block, box on box: 7 slices below, 5 above, a terrace on the front two.
Render8 homes · Horizon and Origin permitted — we start with these
Permitted · startingApartment blocks + linked houses · block A: 14 apartments, 96 room modules + 24 loggias
Permit expected end Nov 20265 family homes next to our 400-apartment Bodóterasz neighbourhood
In design review
Real photoMay 2026 — the structure stood in two days
Structure complete


Thank you · BNI Global Convention · Grimaldi Forum, Monaco · October 2026